Operating theatres, intensive care, isolation ward
Operating theatres are the heart of any hospital or practice with procedure rooms. With their years of experience, the experts at Gesa Hygiene-Gruppe will help you from creation, acceptance and requalification to periodic cleaning.
Our services:
Specialist operating theatre planning
- Support for developers when drafting the medical hygiene tasks for the planning of new operating theatres and renovation of existing ones
- Assessment of draft and detailed plans by architects and general/detailed planners
- Support for building contractors throughout the construction process
DIN 1946-4:2008-12-compliant hygienic acceptance testing and technical acceptance testing of newly established operating theatres
- DIN EN ISO 14644-3-compliant filter fit and integrity testing
- Supply air, exhaust air and overflow flow rate for operating theatre
- Direction of overflow to operating theatre doors
- Direction of overflow to ceiling cavity in the operating theatre false ceiling
- Distribution of supply air speed and temperature at distributor
- Average of supply and exhaust temperature
- Temperature difference of average room air temperature minus average supply air temperature
- Surface temperature of the surfaces surrounding the room (walls, ceiling, floor, etc.)
- Comfort parameters across operating table (air speed, degree of turbulence, air temperature,
- sound pressure level, relative humidity)
- Flow visualisations in accordance with Appendix B
- Determination of protection class
- At the customer's express request: Degree of turbulence measurement in accordance with Appendix D
- Definition of the borders of the protected area
- Hygiene inspection of HVAC system and areas supplied by the HVAC systems
- DIN EN ISO 14644-3-compliant recovery test in class 1b operating theatres
Periodic room inspections in accordance with Table 1: DIN 1946-4:2008-12-compliant inspections of rooms established within a period ≤ 36 months
- Minimum outdoor air and overall volume flow check for each room
- Operating theatres: DIN 1946-4:2008-12-compliant technical inspections on operating theatres established within a period ≤ 36 months
- Room air temperature, room air velocity, relative humidity, sound pressure level and outdoor air rate testing
- DIN EN ISO 14644-3-compliant filter fit and integrity testing
- Value and distribution of supply air discharge speed, calculation of overall supply air flow rate
- Value and distribution of supply air discharge temperatures, calculation of average supply air temperature
- Value and distribution of room air temperatures, calculation of average room air temperature
- Temperature difference of average room air temperature minus average supply air temperature
- Comfort parameters above operating table (air speed, degree of turbulence, air temperature, sound pressure level, relative humidity)
Operating theatres: DIN 1946-4:2008-12-compliant hygiene inspections on established operating theatres - inspection period ≤ 12 months
- Direction of overflow to operating theatre doors
- Direction of overflow to ceiling cavity in the operating theatre false ceiling
- Microbiological monitoring
- Flow visualisation of discharge behaviour and shielding of protection area in accordance with Appendix B
- DIN EN ISO 14644-3-compliant recovery test in class 1b operating theatres - inspection period ≤ 24 months
Operating theatres: Hygiene inspections of existing operating theatres in accordance with Annex B.2 - inspection period ≤ 12 months
(in the case of special regulations in individual federal states)
- Particle counting in all class I rooms directly in the supply air, aerosol delivery where necessary
- Airborne germ concentration measurement in supply air for class I rooms (scope to be determined by hygiene expert)
- Evidence of direction of flow for rooms in operating theatre department at peak and partial load
Disinfection
- Periodic cleaning and disinfection of entire operating theatres